PCK Factory

5000 m2 factory spreading in 10000 m2 land, fully equipped for fabrication of:

  • Building steel structure
  • Industrial steel structure
  • Pressure vessels
  • Pipe Racks
  • Material handling equipment such as Conveyors, Bins, Hoppers, Hood and chutes
  • Duct, Damper and Dedusting equipment
  • DRI plant equipment such as Furnace, Recuperator, Reformer box, Scrubber and stack
No. List of Equipment QTY
1 6 Meter Hydraulic Guillotine Shearing Machine 1
2 Gate Sub-merged Arc Welding Machine 4
3 Radial Arm Drilling Machine 2
4 100 Ton Capacity Punching Machine 2
5 15 Ton Forklift 1
6 5 Ton Forklift 1
7 20 Ton Overhead Crane 2
8 10 Ton Overhead Crane 4
9 5 Ton Overhead Crane 2
10 CNC Sheet Cutting Machine 1
11 Air Compressor 4
12 Sheet Roling Machine 1
13 Sheet Cutting Machine 1
14 Ultra-sonice Test 1
15 Arc Welding Machine 20
16 CO2 Welding Machine 20
17 Upright Drilling Machine 3
18 Airless Machine 4
19 Band Machine 1
20 Universal Cuting Machine 1
21 Spot Welding Machine 1